VOLTRAIL S3
Moved by forklift, running in five minutes
- Solar
- 3,2 kWp
- Battery
- 10,24 kWh
- Inverter
- 5 kVA
Deploys in 5 min, 1 operator · 480 kg
A charging station with no connection and no digging
A complete charging station that needs no grid connection, no permit and no infrastructure works. It sits across two parking spaces, is held down by its own weight and starts charging the same day. The answer for municipalities, industrial parks, hotels and fleets that want charging points now, not after the connection approval.
Purchase
from 39.500 €
excl. VAT, standard configuration
Rental
from 129 EUR/day
delivery and commissioning included
July
34
kWh/day
Year average
23
kWh/day
January
10
kWh/day
Reserve
55,3
usable kWh
Estimates at the national average irradiation of 1280 kWh/kWp. For the exact location, see the figure per county. The gap between July and January is why sizing is done for the critical month of the project, not for the average.
Technical data
The standard configuration. Any line in the table can be changed to order, since this is our own production.
Suitable applications
Moved by forklift, running in five minutes
Deploys in 5 min, 1 operator · 480 kg
Towable on a standard licence, autonomous for a week
Deploys in 15 min, 1 operator · 1.450 kg
The most that fits under 3500 kg
Deploys in 25 min, 2 operators · 2.900 kg
Send us your estimated load and how long the project runs. We reply with the right unit, the expected output for your location and a comparison against an equivalent diesel generator.