Skip to content

Construction sites

Construction site power without a diesel generator

On most site compounds the generator runs all day to power office containers, lighting, power tools and charging points. The real load is a fraction of the installed rating, and the genset burns fuel even at idle.

Typical load in this field:45 kWh/day

The situation today

  • Fuel hauled to site by hand, with losses and theft
  • Noise that generates complaints in residential areas
  • Maintenance every 250 hours and unplanned stoppages
  • A temporary grid connection takes months and costs as much as a mobile unit

With a mobile unit

  • No fuel deliveries for the base load
  • Silent operation, including during quiet hours
  • Moves with the work front, the same day
  • Monthly energy and CO₂ report for the project’s environmental reporting

Suitable configurations

What we recommend for construction sites

photograph · T8
Trailer

VOLTRAIL T8

Towable on a standard licence, autonomous for a week

Solar
8,1 kWp
Battery
20,48 kWh
Inverter
10 kVA

Deploys in 15 min, 1 operator · 1.450 kg

from 24.500 € excl. VAT

or rent from 83 EUR/day

Full specifications
render · T15
Trailer

VOLTRAIL T15

The most that fits under 3500 kg

Solar
14,4 kWp
Battery
40,96 kWh
Inverter
20 kVA

Deploys in 25 min, 2 operators · 2.900 kg

from 41.800 € excl. VAT

or rent from 137 EUR/day

Full specifications
render · C60
Folding container

VOLTRAIL C60

A 60 kWp plant inside a 20-foot container

Solar
60 kWp
Battery
122,88 kWh
Inverter
50 kVA

Deploys in 45 min, 2 operators · 11.500 kg

from 148.000 € excl. VAT

or rent from 475 EUR/day

Full specifications

Other fields

Tell us what you need to power

Send us your estimated load and how long the project runs. We reply with the right unit, the expected output for your location and a comparison against an equivalent diesel generator.