Skip to content

Infrastructure

Site power and solar light towers for road and rail works

Linear works move constantly, and a grid connection makes no economic sense on a section finished within months. Work points are isolated, and fuel supply becomes a logistics operation in itself.

Typical load in this field:60 kWh/day

The situation today

  • Work fronts advancing several kilometres a month
  • Fuel delivery over improvised access roads
  • Signage and lighting that must run at night, unattended
  • Increasingly strict environmental requirements in EU-funded contracts

With a mobile unit

  • One unit follows the work front without re-permitting
  • Guaranteed supply for signage and safety lighting
  • Documented avoided emissions, useful when reporting to the funder
  • Unattended operation, with telemetry and alerts

Suitable configurations

What we recommend for infrastructure

render · T15
Trailer

VOLTRAIL T15

The most that fits under 3500 kg

Solar
14,4 kWp
Battery
40,96 kWh
Inverter
20 kVA

Deploys in 25 min, 2 operators · 2.900 kg

from 41.800 € excl. VAT

or rent from 137 EUR/day

Full specifications
render · C60
Folding container

VOLTRAIL C60

A 60 kWp plant inside a 20-foot container

Solar
60 kWp
Battery
122,88 kWh
Inverter
50 kVA

Deploys in 45 min, 2 operators · 11.500 kg

from 148.000 € excl. VAT

or rent from 475 EUR/day

Full specifications
render · C120
Folding container

VOLTRAIL C120

A 120 kWp plant that relocates the same day

Solar
120 kWp
Battery
245,76 kWh
Inverter
100 kVA

Deploys in 90 min, 3 operators · 21.000 kg

from 268.000 € excl. VAT

or rent from 851 EUR/day

Full specifications

Other fields

Tell us what you need to power

Send us your estimated load and how long the project runs. We reply with the right unit, the expected output for your location and a comparison against an equivalent diesel generator.