VOLTRAIL C60
A 60 kWp plant inside a 20-foot container
- Solar
- 60 kWp
- Battery
- 122,88 kWh
- Inverter
- 50 kVA
Deploys in 45 min, 2 operators · 11.500 kg
Mining and quarries
A quarry or an open-pit operation constantly relocates its work points, and fixed supply infrastructure quickly becomes useless. Loads are large and continuous, so the fuel saving is proportionally larger too.
Typical load in this field:220 kWh/day
The situation today
With a mobile unit
Suitable configurations
A 60 kWp plant inside a 20-foot container
Deploys in 45 min, 2 operators · 11.500 kg
A 120 kWp plant that relocates the same day
Deploys in 90 min, 3 operators · 21.000 kg
The most that fits under 3500 kg
Deploys in 25 min, 2 operators · 2.900 kg
Send us your estimated load and how long the project runs. We reply with the right unit, the expected output for your location and a comparison against an equivalent diesel generator.