VOLTRAIL C120
A 120 kWp plant that relocates the same day
- Solar
- 120 kWp
- Battery
- 245,76 kWh
- Inverter
- 100 kVA
Deploys in 90 min, 3 operators · 21.000 kg
Defence and humanitarian missions
On mission, every litre of fuel transported is a logistics cost and a vulnerability. Reducing dependence on resupply convoys is an operational objective, not just an environmental one. This is the segment where European players already work with national armed forces.
Typical load in this field:300 kWh/day
The situation today
With a mobile unit
Suitable configurations
A 120 kWp plant that relocates the same day
Deploys in 90 min, 3 operators · 21.000 kg
A 60 kWp plant inside a 20-foot container
Deploys in 45 min, 2 operators · 11.500 kg
Moved by forklift, running in five minutes
Deploys in 5 min, 1 operator · 480 kg
Send us your estimated load and how long the project runs. We reply with the right unit, the expected output for your location and a comparison against an equivalent diesel generator.