Skip to content

Local government

Mobile EV charging stations with no grid connection

A municipality that wants charging points, lighting for a market or power for a recreation area hits the same reality: design and connection take longer than the budget cycle. Mobile equipment is a goods purchase, not a capital works project.

Typical load in this field:50 kWh/day

The situation today

  • Long timelines for design, approval and connection
  • Fixed investment in a location that may turn out to be the wrong one
  • Capital budgets hard to access for works
  • Public pressure for charging infrastructure

With a mobile unit

  • An equipment purchase, with a much simpler procedure
  • Can be moved if the location does not prove suitable
  • Works for markets, events and recreation areas
  • Visible as an environmental project, with real generation data

Suitable configurations

What we recommend for local government

render · EV
Mobile charging station

VOLTRAIL EV

A charging station with no connection and no digging

Solar
6,5 kWp
Battery
61,44 kWh
Inverter
22 kVA

Deploys in 60 min, 2 operators · 3.200 kg

from 39.500 € excl. VAT

or rent from 129 EUR/day

Full specifications
photograph · T8
Trailer

VOLTRAIL T8

Towable on a standard licence, autonomous for a week

Solar
8,1 kWp
Battery
20,48 kWh
Inverter
10 kVA

Deploys in 15 min, 1 operator · 1.450 kg

from 24.500 € excl. VAT

or rent from 83 EUR/day

Full specifications
render · T15
Trailer

VOLTRAIL T15

The most that fits under 3500 kg

Solar
14,4 kWp
Battery
40,96 kWh
Inverter
20 kVA

Deploys in 25 min, 2 operators · 2.900 kg

from 41.800 € excl. VAT

or rent from 137 EUR/day

Full specifications

Other fields

Tell us what you need to power

Send us your estimated load and how long the project runs. We reply with the right unit, the expected output for your location and a comparison against an equivalent diesel generator.