VOLTRAIL S3
Moved by forklift, running in five minutes
- Solar
- 3,2 kWp
- Battery
- 10,24 kWh
- Inverter
- 5 kVA
Deploys in 5 min, 1 operator · 480 kg
Emergency response
After a flood, a major storm or an earthquake, electricity supply is the first condition of any organised response. A mobile unit is operational in minutes and does not depend on a fuel supply chain that, in those days, is blocked.
Typical load in this field:35 kWh/day
The situation today
With a mobile unit
Suitable configurations
Moved by forklift, running in five minutes
Deploys in 5 min, 1 operator · 480 kg
Towable on a standard licence, autonomous for a week
Deploys in 15 min, 1 operator · 1.450 kg
A 60 kWp plant inside a 20-foot container
Deploys in 45 min, 2 operators · 11.500 kg
Send us your estimated load and how long the project runs. We reply with the right unit, the expected output for your location and a comparison against an equivalent diesel generator.