Solar power trailer rental, when the project is shorter than the payback
For a project of a few months, renting a solar power trailer is almost always better value than buying. Ours has no fuel in the rate: it includes transport, commissioning, monitoring and service, so the only thing left for you is the consumption.
Rates
Daily cost, depending on duration
Rates decrease with contract length. Those below are indicative, for the standard configuration and for locations within 150 km of the nearest depot.
| Model | Power | 1 – 6 days | 1 – 3 weeks | 1 – 3 months | over 3 months |
|---|---|---|---|---|---|
| VOLTRAIL S3 | 3,2 kWp | 38 EUR/day | 31 EUR/day | 26 EUR/day | 21 EUR/day |
| VOLTRAIL T8 | 8,1 kWp | 83 EUR/day | 68 EUR/day | 56 EUR/day | 46 EUR/day |
| VOLTRAIL T15 | 14,4 kWp | 137 EUR/day | 112 EUR/day | 93 EUR/day | 75 EUR/day |
| VOLTRAIL C60 | 60 kWp | 475 EUR/day | 390 EUR/day | 323 EUR/day | 261 EUR/day |
| VOLTRAIL C120 | 120 kWp | 851 EUR/day | 698 EUR/day | 579 EUR/day | 468 EUR/day |
| VOLTRAIL EV | 6,5 kWp | 129 EUR/day | 106 EUR/day | 87 EUR/day | 71 EUR/day |
1 – 6 days
tarif de zi
1 – 3 weeks
−18%
1 – 3 months
−32%
over 3 months
−45%
- Return transport included within 150 km
- Commissioning and on-site operator training
- Monitoring and service throughout
- Monthly energy and avoided CO₂ report
How it works
From first call to first kilowatt
01
You tell us what needs power
The estimated daily load or the rating of the genset you use today, plus the location and the period. If you do not know the load, we estimate it together starting from the equipment on site.
02
You get the sizing and the rate
Within the same working day: the right model, the expected output for your county, the rate for the requested period and whatever remains on a backup genset.
03
We deliver and commission
Transport is on us. The unit arrives deployed and working, with operator training on the spot. Under an hour for trailers.
04
We monitor remotely
You see generation and consumption in the app. If something drifts, we see it before you do and act. At the end we collect the unit from site.
Coverage
Delivery included across Romania, Europe on request
Transport within Romania is included in the rate, and every county has its own page with local photovoltaic output and per-model estimates. For a project elsewhere in Europe we quote transport separately, per distance and border formalities. Ask us with the location and dates.
We check availability for your dates
Tell us the period and the location, and we confirm which units are free and how soon they can be on site.